Know what is ready for Editor, what needs attention, and which checks describe the current saved project.
Before you begin
- Select the episode whose script and storyboard you want to review.
- Have access to the source material and the intended images, clips and narration.
- Save current changes before checking saved project findings or production output.
Check the correct part of the project
Open Review or the selected card's checks in the Creator canvas. Read the heading: a project, series, episode, script or visual check has a different scope. Start with the episode, then inspect the script or visual named by a notice.
The checks available depend on what you selected. If a tab you expect is missing, confirm the selected card and episode before assuming the check has failed.
| Check | What to inspect |
|---|---|
| Readiness | Missing information or unresolved choices for the selected episode or visual. |
| Timing | Planned section and shot timing, reading estimates and timing conflicts. |
| Continuity | Whether the visual sequence and recurring choices remain consistent. |
| Sources & evidence | Source links, supporting passages and items needing your review. |
| Media checks | Missing or unsuitable media and remaining attachment requirements. |
| Output | Whether a saved episode has a current verified export. |
Review the complete story
Read the script in order
Check that the opening promises something the main sections and ending deliver. Resolve repeated ideas, unexplained references and missing transitions.
Verify factual details
Compare names, dates, quantities and claims with their sources. A passage linked to a section is useful evidence to inspect, not automatic confirmation that the sentence is correct.
Inspect every intended visual
Check that the selected image or clip supports the words. Look for an accepted shot plan that still lacks production media, and review any visual that changed after the script.
Read and listen for timing
Read the script aloud and listen to any attached narration. Compare the planned durations with the actual material. Check captions against the recording when captions are present.
Resolve notices at their source
Open the affected script, visual or settings control and address the specific issue. For a missing visual, attach and review media. For a long section, revise the words or reconsider the duration. For an incorrect source association, inspect and correct the relevant source links.
Return to the same review scope after editing. A change to script wording, scene choices, media or timing can affect something you reviewed earlier. Continue only when you understand any remaining notices and the workspace allows the next action.
Know when findings describe saved work
Inspect sources & existing issues opens available project findings. Save the project when prompted, then use Refresh to request the saved issues again. If you have unsaved edits, the panel can show a notice that its issues come from the last saved project.
Read coverage messages as well as the issue count. No saved issues found is different from a complete review of every possible problem. A partial or unavailable check means that part of the review still needs attention. Retry saved-source indexing uses the last saved source, so save source changes first.
Separate planning readiness from output status
Episode production and Output describe later stages of the workflow. Use Check saved output after saving when you need to refresh that information. These states do not replace watching and listening to the exported video.
| State | What to do |
|---|---|
| Not ready or Missing assets | Read the listed blockers and supply the required production material. |
| Rendering | Wait for the active render and check its status. |
| Render failed or Render cancelled | Inspect the render result and resolve the cause before retrying. |
| Output verification pending | Wait for verification before treating the output as ready. |
| Previous-version export | Check which changes were made after that export and render the intended saved version. |
| Verified export ready | Preview the actual file. Still review narration, caption alignment and content yourself. |
Save and continue to Editor
Before opening Editor, confirm the selected episode, save the reviewed work and check that its required media is available. If the episode already has Editor changes, read the reconciliation choices before applying another prepared timeline.
If review stays blocked, note the project and episode names, the action you tried and the exact notice. Use the saving and handoff troubleshooting guide for version or navigation problems. General Help is available for issues you cannot resolve from the displayed guidance.
Check your result
- I reviewed the intended episode and the scope of each check.
- The script, sources and intended visuals support the same story.
- I understand incomplete checks and any saved-version notices.
- I saved the project and know whether I am reviewing a plan, a timeline or an export.
Tell us what you were trying to do and the message you saw.
