Browse documentation
← Creator StudioFind another guide
Creator Studio

Revise source content and preserve existing work

A corrected source can affect your script, visuals, narration, and citations. Save the existing work first, then decide whether you need a small script correction or a separately prepared updated project. In-place source revision is described below only for views that show its controls.

On this page
What this guide helps you do

Keep a clear earlier copy, prepare updated content, and identify which linked work needs review before continuing.

Before you begin

  • Keep the existing project open until its latest changes have been saved.
  • Prepare the complete updated source and retain the original document or text for comparison.
  • Identify the episodes and any Editor work that already use the earlier material.

Choose the right kind of update

Choose based on the content you intend to change. Adding another source or starting another episode does not silently replace an earlier applied source.

Changing source content and editing a script serve different purposes.
What you needPractical routeWhat to expect
Correct a sentence in an existing scriptEdit the selected script section.The script changes; its retained source text is not automatically rewritten.
Prepare a revised version while keeping earlier work separateCreate a new project from the updated source.The earlier saved project remains available. Its manual edits and media are not automatically copied into the new project.
Revise an applied source where the control is shownUse Revise source and review the complete replacement.The earlier source and authored work are retained, and new work linked to the revised source needs review.

Preserve the current work first

  1. Save the existing project

    Use Save project and wait for confirmation. Check the project name and saved version. A finished video export does not preserve the editable source, script, and storyboard.

  2. Keep a draft copy when available

    Use Export draft to retain a Creator draft file. It contains project information and references, not a bundled copy of every media file. Keep original documents, images, video, and narration separately.

  3. Record what needs to change

    Note corrected facts, removed passages, new sections, and wording that must stay. Include any recorded narration or existing Editor sequence affected by those changes.

Prepare the updated source as a separate project

This is the practical route when the main canvas does not offer Revise source. It keeps the earlier saved project separate while you review the updated material.

  1. Open Library and Projects

    Go to Creator Library, select Projects, and choose New project. If Start a new project? warns that unsaved changes will be discarded, cancel and preserve those changes before continuing.

  2. Enter the complete replacement

    In Prepare Content, provide the updated text or document. Include the context that should remain, not only the changed paragraphs. Give the new project a distinct name so you can tell it apart from the earlier version.

  3. Review preparation choices

    Check the intended video or series, length approach, language, and proposed sections. Review cleanup exclusions and source coverage before applying the prepared content.

  4. Inspect and save the new work

    Compare the resulting script and storyboard with both the updated source and the earlier project. Carry over only the wording and media choices you deliberately review. Save the new project after checking it.

When Revise source is available

Original content and Revise source may not appear on the main Creator canvas. Use these steps only when those controls are displayed. Begin from a saved project without other pending changes.

  1. Identify the current applied source

    Expand Original content and Source content & coverage. Find the source marked Current applied source, check its title, then choose Revise source for that source. A retained original with no current applied ranges is not the current revision target.

  2. Review the full replacement text

    In Revise applied source, provide the complete revised source as text. Check the prepared sections and their source links. This revision reviews the complete replacement rather than letting you exclude individual replacement sections.

  3. Confirm the replacement deliberately

    Read the confirmation about replacing the current applied source while retaining its original and existing edits. Select it only after checking the replacement, then choose Apply source revision.

  4. Review before saving

    Applying retains the old source and existing scripts, storyboard, media, protection, and Editor work. It retires the old source's current applied ranges and adds new work linked to the revised source. Inspect that new work, then save.

Check every affected part of the video

  • Compare script sections with the revised passages. Recheck facts, quotations, numbers, and any material removed during preparation.
  • Inspect the source status of both earlier and newly prepared episodes. Distinguish retained material from current applied source links.
  • Review storyboard requirements and attached media. A suitable earlier image may still be reusable, but confirm that it illustrates the revised words.
  • Listen to narration against the updated script and recheck timing and captions. An old take may no longer match.
  • Review any existing Editor work through the normal handoff process. Updating Creator content does not itself rebuild an existing Editor timeline.

If the revision cannot continue

Use Cancel source revision to leave an unapplied revision. If you edited its text, Discard edits confirms that the preview edits will be removed. Check what you need to keep before confirming.

If the source or saved project changed during review, preserve your replacement text, reopen the correct project, and prepare the review again. Do not assume an earlier preview applies to a newer version.

A project can retain up to eight sources. If that limit prevents another revision, keep the existing project and use a separate updated project. A refusal to apply is not permission to remove older originals.

Check your result

  • The earlier project and original source are preserved.
  • The complete updated text and any exclusions have been reviewed.
  • I know which project or episodes contain the current source-linked work.
  • Scripts, media, narration, and existing Editor work have been checked for affected content.
  • The reviewed changes are saved, with no pending source preview mistaken for a saved version.
Still have a question?

Tell us what you were trying to do and the message you saw.

Contact support
Revise Source Content and Preserve Your Work | ZOVOZ